Permit guide

San Marcos, TX Building Permits

How to get a remodeling, addition, pool or new home permit in San Marcos, Texas: where to apply, which codes apply and the local rules, from official city sources checked October 18, 2026.

Where to applyMGO Connect
Adopted codes2021 International Residential Code (Ordinance 2023-09)
Review timeNot published
ContactPermit Center, 512-805-2630

What San Marcos requires

  • Apply, pay, track comments and schedule inspections in MGO Connect; phone verification is done by call.
  • Exterior changes in local historic districts need a certificate of appropriateness; interior only work and ordinary maintenance are generally exempt.
  • The city adopted a Historic Preservation Plan in February 2026 and a Land Development Code update in June 2026, so older checklists may be out of date.

Fees

San Marcos charges permit and inspection fees set by city ordinance. We did not find a current residential fee schedule on the city website, so we confirm the fees for your project with the city before we quote.

Before you apply

  • Confirm the address is inside San Marcos city limits. Land in the extraterritorial jurisdiction or unincorporated county follows Hays County rules instead of the city's building permit.
  • Check the deed restrictions and get HOA approval if the neighborhood has one; cities do not enforce private restrictions, and HOA review is a separate step.
  • Find out whether the lot is in a floodplain, on a septic system or near protected trees, since each adds a review.
  • Pull the property's permit history so open or expired permits are dealt with before a new application.

How the process works

  • Prepare the application and plans for the project type: a site or plot plan, floor plans and any structural, electrical, plumbing and mechanical plans the city asks for
  • Submit through MGO Connect and pay the review fee
  • Answer the reviewer's comments, revising the plans where needed, and resubmit
  • Once the permit is issued, schedule each required inspection in order and keep the approved plans on site
  • Pass the final inspection; new homes and added living space then receive their certificate of occupancy or final approval

Texas licensing for remodeling trades

WhoWhat Texas requires
General contractorsTexas has no state license for general contractors; cities register contractors locally (Austin, Cedar Park and Marble Falls, for example).
ElectriciansElectrical work requires a license from the Texas Department of Licensing and Regulation (apprentice, residential wireman, journeyman or master, working under a licensed electrical contractor).
PlumbersPlumbing work requires registration or a license from the Texas State Board of Plumbing Examiners (apprentice, tradesman, journeyman or master).
Air conditioning and refrigerationTDLR registers technicians, certifies technicians who pass an exam, and licenses contractors, who need 48 months of experience and an exam. Registered technicians work under a licensed contractor. Handling refrigerant also requires EPA Section 608 certification.
HomeownersMany cities let homeowners pull permits for their own homestead. In Austin that includes electrical, plumbing and mechanical work, with exceptions such as the main electric service and refrigerant work.

Sources: TDLR: Air Conditioning and Refrigeration Contractors; TDLR: Electricians; Texas State Board of Plumbing Examiners; City of Austin Homeowner's Permit.

Project permit guides

Our project guides go deeper on each type of work, with City of Austin review tracks, documents and fees that are a useful reference for any city in the metro: kitchen remodel, bathroom remodel, whole home renovation, home addition, ADU (additional dwelling unit), garage conversion, new garage, deck and patio cover, swimming pool, new home and investor and flip renovation.

Frequently asked questions

Where do I apply for a building permit in San Marcos?

Through MGO Connect. Questions go to Permit Center, 512-805-2630.

Which building code does San Marcos use?

2021 International Residential Code (Ordinance 2023-09).

How long does permit review take in San Marcos?

San Marcos does not publish a standard residential review time; ask the city. Complete plans that answer the checklist the first time are the best way to avoid extra review rounds.

Sources

Related

General information gathered from official sources on October 18, 2026, not legal advice. Codes, fees and procedures change; we confirm them for your address during the free consultation and handle the permit for you.